3D laser scanner Assembly Prefabrication Studies

Relocation of LPG loading & unloading stations

Relocation of the LPG loading and unloading stations to comply with PPRT standards.

Realization of scanner readings, studies and integration of the loading arms and fire crown in the point cloud.

Realization of the prefabrication in workshop and installation on site of the new piping and frames.

Identity card

Sector Gas
Location Isère (38)
Type of project Studies / Scan / Prefabrication / Assembly
Delivered on September 2019

Relocation of LPG loading and unloading stations

Studies, scanner readings, prefabrication, assembly :

  • Studies, 3D scanner surveys of the site
  • Scanning surveys of truck loading and unloading stations, loading arms and fire crowns for integration in the point cloud.
  • Realization of the complete 3D model of the installation
  • Realization of manufacturing plans and assembly of piping, frames and support structures
  • Realization of the layout plans of the GC and equipment (loading arms, crowns)
  • Prefabrication and installation of 500 meters of LPG pipework DN50, DN80 and DN150
  • 1 Piping subject to PED III
  • 7 Piping subject to DESP II
  • 150 meters of DN25 valve collection pipework
  • 75 meters of compressed air piping
  • Prefabrication and installation of all pipe supports
  • Preparation and realization of the requalification test of the 450M3 tank
  • Preparation and realization of hydraulic tests of all submitted piping systems