Realization in a very short period of time of the studies, the supply, the prefabrication and the paint treatment of 3 storage tanks 5500 Liters.

Identity card

Sector SPIE
Location La Baule (44)
Type of project Studies / Prefabrication
Delivered on October 2020

Seawater storage tanks

Studies, prefabrication :

  • Very short realization schedule ( 3,5 Weeks).
  • Realization of manufacturing plans.
  • Supply of materials.
  • Prefabrication in the workshop.
  • Painting treatment of the 3 balloons.
  • Transport and delivery to the customer.